What happens when

Your renovation, step by step

Eleven steps from the first call to the first shower or the first dinner. What happens at each one, what you need to do, and whether you can use the room.

  • Steps 1 to 4: planning, at your pace. The room still works.
  • Steps 5 to 10: on site
  • Step 11: it's yours again
Which job is yours?
  1. Planning

    You get in touch

    Call Rob, or send the short form with a few details. If you've used the cost guide, your choices come with it, so he knows roughly what you have in mind.

    Your partRoughly what you'd like, your suburb, and whether it's your only bathroom.whether you'll be living at home during the work.

    Room in use

  2. Planning

    Rob comes to see the room

    He looks at the room, measures it properly, checks the floor and walls, and talks through what you want and what's possible. It's the best time to ask questions.

    Your partShow him what bugs you about the room, and any ideas or pictures you've saved.

    Room in use

  3. Planning

    A written quote

    The quote sets out the work, what's included, and what you're choosing or buying yourself. In a home built before 1990 it also covers whether the old sheeting needs an asbestos test.

    Your partRead it, ask about anything unclear, and say yes when you're ready.

    Room in use

  4. Planning

    Choices and a start date

    Tiles, vanity, tapware, toilet and glass are chosen, and a start date is booked so everything is on site when it's needed.

    Cabinet colours, benchtop, splashback, handles and appliances are chosen, and a start date is booked so everything arrives in order.

    Your partMake your choices. Clear the bathroom cupboards before day one.Pack the kitchen cupboards before day one.

    Room in use

    Showering: this is when your temporary arrangement is planned, so it's ready before the strip-out.

    Cooking: plan a temporary kitchen: a bench and sink in the laundry or garage, the fridge somewhere handy.

  5. On site

    Protection and strip-out

    Floors and the path through the house are covered. Then the old room comes out, back to the frame and the slab: cabinets, benchtop, splashback and appliances, and the rubbish goes. Where asbestos is suspected, a licensed removalist deals with it first.

    Your partExpect noise and dust for the day. Keep pets and little ones clear.

    Room out of action

    Showering: your temporary arrangement starts today.

    Showering: use your other bathroom until handover.

    Cooking: your temporary kitchen starts today.

  6. On site

    The carpentry: frame, floor and walls Carpentry

    With the room open, the bones are checked. Rotten or damaged timber is replaced, walls are straightened and packed, and solid timber goes in wherever something heavy will be fixed: the vanity, the towel rails, the shower screen.the wall cabinets, the rangehood, the island.

    Your partNothing, unless something turns up behind the wall. If it does, Rob shows you and explains it before going on.

    Room out of action

  7. On site

    Plumbing and wiring roughed in Licensed trades

    The plumber and electrician run new pipes, wastes, power and lighting to where the new room needs them, inside the open walls. A new floor waste or linear drain goes in now.The sink, dishwasher, cooktop and oven get their connections.

    Your partConfirm the positions of anything you've changed your mind about. After this, moving things gets harder.

    Room out of action

  8. On site

    Sheeting and waterproofing Waterproofer

    Walls patched, cabinets in Carpentry

    The walls are sheeted, then a licensed waterproofer seals the floor, the shower and the wall joins. It's left to cure before any tile goes on.

    The walls are patched and made good, then the cabinets go in: packed, levelled, scribed to the walls and fixed, so the run is straight and the doors will meet evenly.

    Your partNothing. The waterproofing is the most important layer you'll never see.You'll start to see the shape of your new kitchen.

    Room out of action

  9. On site

    Tiling Tiler

    Benchtop and splashback Stone mason, tiler

    Floor and walls are tiled, the niche finished and everything grouted and sealed.

    Once the cabinets are fixed, the benchtop is measured to them, made and fitted. Then the splashback goes on.

    Your partHave a look. It's the point the room starts to look like the picture in your head.

    Room out of action

  10. On site

    Fit-off

    Vanity, tapware, toilet, shower screen, mirror, lights and accessories go in, and the plumber and electrician connect and test everything.

    Doors, drawers and handles go on and are adjusted until the gaps are even. The sink, appliances and lights are connected and tested.

    Your partMake sure anything you're supplying yourself is on site.

    Room out of action

  11. Done

    Clean, walk-through and handover

    The room is cleaned and you walk through it with Rob, checking every door, drawer and tap. Stoneys is local to Nambour, so if anything needs a look later, it's not far to come.

    Your partEnjoy the first shower.Cook the first dinner.

    Back in use

Questions

Questions about the process

Do I need to move out?

Most people don't. A bathroom renovation is easiest with a second bathroom or a temporary arrangement, and a kitchen with a temporary bench and sink somewhere else in the house. Both get planned at the quote.

Who will be in my house?

Rob, and the licensed trades from his network that your job needs: usually a plumber, an electrician, a waterproofer and a tiler. You'll know who's coming and when.

What if something is found behind the wall?

It happens in older houses: rotten timber, an old leak, wiring that isn't safe. Rob shows you what he's found, explains the fix and the cost, and goes on only once you've agreed.

When do I pay?

Your quote sets out the payment stages. Ask Rob about them when you get it.

Ready for step one?

Call Rob, or price your room first and send it with your details.